Roadmap for the development of candidate vaccines for FMD
Download FMD Vaccine Roadmap14
Identity of immunomodulators
Dependencies
Next steps
Research Question
What are we trying to achieve and why? What is the problem we are trying to solve?
Identify the immunomodulatory factors/evasion mechanisms of FMDV
Research Gaps and Challenges
What are the scientific and technological challenges (knowledge gaps needing to be addressed)?
- Determine FMDV immune evasion mechanisms: is diversity a virulence factor?
- Identify the mechanisms of immunomodulation and the virus proteins responsible
Solution Routes
What approaches could/should be taken to address the research question?
- Studying the biological significance of the antagonistic events under physiological conditions of FMDV infection, preferably in primary cells from relevant target tissues of natural host species
- Generation of a range of knock-out viruses where the genes for various immunomodulatory factors or other stealth mechanisms have been removed and their use in experimental infections.
Dependencies
What else needs to be done before we can solve this need?
Host pathogen interaction
State Of the Art
Existing knowledge including successes and failures
FMDV can evade innate immune responses through its ability to shut down cellular protein synthesis, including IFN type I, in susceptible epithelial cells. While earlier work identified roles for FMDV L(pro) and 3C(pro) in inhibiting the production of type I IFN, new data show that 3C(pro) can also impede signalling downstream of the type I IFN receptor. Recent research also identified distinct roles for the two forms of L(pro) that arise during viral replication, Lab(pro) and Lb(pro), with implications for our understanding of this protein as a molecular virulence factor
Projects
What activities are planned or underway?
spatial model of foot and mouth disease outbreak in an endemic area of thailand
Planned Completion date 01/10/2021
Netherlands
Epidemiology of foot-and-mouth disease outbreaks in Thailand from 2011 to 2018
Planned Completion date 01/11/2022
Netherlands